Throughout the first half of 2008 Normoyle Engineering simultaneously worked on the Melbourne Eastlink ventilation stack facades and the balustrades, handrail, metal and glass work at the Chatswood Transport Interchange. Completion of both of these projects on time is a testament to Normoyle's ability. Working on a difficult to access site, with drop-dead dates for partial opening sporadically through-out the project, Normoyle once again managed to fabricate and install a high quality, safe product.